Sun
STS-115
US Space Shuttle delivered solar panels to the Space Station.

Completed or retired · Historical mission record
View in 3D map ↗Overview
The mission
US Space Shuttle delivered solar panels to the Space Station. This reconstructed record groups 3 GCAT payload or flight elements under launch 2006-036; fields not present in GCAT are intentionally left unset.
Launch profile
The launch
- Launch
- 9 September 2006, 15:14:55 UTC
- Launch location
- NASA John F. Kennedy Space Center, Florida
- Launch vehicle
- Space Shuttle
- Orbit
- Lower low Earth orbit (inclined)
Trajectory
Mission timeline
Interactive playback
Play trajectory in 3D ↗Follow the mission through its available trajectory data in the full 3D solar-system map.
Mission outcomeOpen outcome source ↗
Mission ended — Completed or retired
Operations concluded · 21 September 2006
Historical mission record
GCAT records the primary mission element as completed or no longer operational.
Hardware
Spacecraft
STS-115
US Space Shuttle delivered solar panels to the Space Station.
- GCAT ID
- S29391
- Manufacturer
- Boeing North American/Palmdale
- Launch mass
- 94,412 kg
- Dimensions
- 37.3 m long · 23.8 m diameter · 37.3 m span
ITS P3/P4
GCAT program: ISS Truss.
- GCAT ID
- A07058
- Manufacturer
- BOTUL/PWRD
- Launch mass
- 2,680 kg
- Dimensions
- 12.9 m long · 2.2 m diameter · 14.2 m span
ITS P4
GCAT program: ISS Truss.
- GCAT ID
- A07059
- Manufacturer
- BOTUL/PWRD
- Launch mass
- 5,826 kg
- Dimensions
- 12.9 m long · 2.2 m diameter · 14.2 m span
Visual archive
Gallery
One image from STS-115.

Verification

Community discussion
Comments 0
No comments yet. The airlock is open.
Sign in or create an account to comment and vote.